                                 SOFTWARE TESTING 

PART - A
1. Differentiate validation and verification
2. Define fault and failure.
3. List the sources from which the defects stem.
4. Give an example for precondition and post condition in a software testing process.
5. When the random testing should be performed.
6. What is exhaustive testing.
7. Is it possible to design test cases by guessing errors ? Justify.
8. In a control flow graph, there are 19 edges and 12 nodes. Calculate the cyclomatic complexity.
9. What are the effects of security breaches?
10. What is scenario testing?
11. Differentiate alpha and beta testing.
12. What is exploratory testing?
13. What arguments would you give to a person who says that the testing job is not challenging?
14. List the factors that are covered by the test plan?
15. Testing requires a robust infrasturcture to be planned upfront. What are the three esssential elements this infrastructure is made up of?
16. What are the skills needed by a test specialist.
17. What is software test automation?
18. Why regression tests are automated/
19. Define outstanding defects rate.
20. How the defects per 100 hours of testing are calculated?

PART - B
21. Discuss the software principles in detail.?
22. Is equivalence class partitioning and boundary value annalyses are Black Box testing techniques? If yes, explain with example.
23. Explain how the covering code logic and paths are used in the role of white box testing design with examples.
24. a. How integration testing is performed? Explain.
       b. Under what circumstances the design defects occur?  Discuss
25. Describe non-functional testing techniques in detail.
26. Discuss how the testing like any project should be driven by a plan.
27. a. What are the skills needed for automation. Explain.
      b. With the neat diagram. Discuss the architecture of test automation.
28. Enumerate the set of metrics that tracks how the different activities of the project are progressing.